HaKu-Tech GmbH
MENU ☰
Case Study 02 · International Plant Management

Stabilize the plant. Empower the local team.

Interim plant management at an automotive Tier 1 site in Portugal. Operational restructuring, restored profitability and a structured handover to an internally developed successor.

≈ 290employees at the manufacturing site
12 monthsuntil the plant returned to profitability
17 monthsuntil handover to the local successor
The challenge

Complex manufacturing under severe delivery pressure.

Persistent delivery problems were intensified by an additional production launch. Quality deviations, rework, premium freight and unstable processes strained the site and its relationships with two OEM plants in Portugal and Spain.

Industrial context

Automotive interior components manufactured through large-scale injection molding up to 15,000 kN, flocking, painting and extensive assembly operations.

Assignment objective

Restore operational stability and profitability, develop a capable local management team and establish sustainable on-site leadership.

Approach

Technical rigor and local leadership together.

01 / PEOPLE

Develop leaders

Build a local core team, clarify responsibility in production and quality, and develop key people for long-term ownership.

02 / FLOW

Restructure operations

Rework material flows and assembly layout, stabilize logistics and supplier control, and establish appropriate buffers.

03 / QUALITY

Build quality into process

Visualize inspection standards, introduce in-process controls and gauges, and improve tooling and assembly processes.

Progress

From crisis operations to local ownership.

MONTH 01

Contain the crisis

Prioritize delivery and quality issues and launch immediate countermeasures.

MONTH 03

New team operational

Leadership stabilized, quality root causes tracked and supplier processes under control.

MONTH 06

Layout transformed

New production layout in place, only internal quality containment and occasional premium freight.

MONTH 09

Stable operations

Tool improvements completed; external quality containment and premium freight ended.

MONTH 12

Profitability restored

Plant returned to profit; continuous improvement embedded and succession preparations underway.

MONTH 17

Local handover

Plant management transferred to a successor from the core team following a comprehensive transition.

Outcome

Operational results. Lasting ownership.

Manufacturing stabilized, financial performance recovered and a local management team gained the capability to lead independently. The handover to an internal successor was an integral part of the assignment's success.

This case study is anonymized. Timings and outcomes are based on HaKu-Tech project documentation prepared in 2016.

Discuss an international assignment ↗